IWL Tailings Discharge and Return Water Pipeline Construction

Client: Evolution Mining Ltd

Project : IWL Tailings Discharge and Return Water Pipeline Construction

Site : Lake Cowal Operations

Date : February 2020 – May 2020

Supply and installation of a 2460mtr 500mm PN16 HDPE pipeline for the discharge of tailings. Supply and installation of 2260mtr 500mm PN10 HDPE pipeline for the use of tailings return water. The project included the supply and installation of all valves, y junctions, flow metres and air release components

A Truck Is Being Loaded With Pipes In A Construction Site — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: BGC Construction
A Yellow Komatsu Excavator Is Working On A Pipe — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Clarke Energy
A Truck Is Being Lifted By A Crane On A Dirt Road — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Synergy Resource Management
A Large Semi Truck Is Carrying A Large Load Of Pipes — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Synergy Resource Management
A Man Is Digging In The Dirt Near A Body Of Water — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Newcrest Mining Ltd
A Truck Is Carrying A Yellow Excavator On A Dirt Road — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Monadelphous
A Row Of Construction Vehicles Are Parked On The Side Of A Dirt Road — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Evolution Mining Ltd
A Construction Site With A Lot Of Pipes And A Yellow Excavator — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Newcrest Mining Ltd
A Construction Site With Pipes And A Bridge In The Background — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Abergeldie Complex Infrastructure, Veolia Water
A Yellow Komatsu Excavator Is Working On A Dirt Road — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Aurelia Metals Ltd
More Posts