Springvale Water Treatment Plant

Client: Abergeldie Complex Infrastructure, Veolia Water

Project : Springvale Water Treatment Plant

Site : Mt Piper, Veolia Water

Date : June 2018 – November 2019

Blackpoly completed the workshop fabrication of pipe spooling from DN32 to DN900. Blackpoly also provided an experienced onsite team for the site construction and installation of pipe spooling, inclusive of civil and mechanical components

A Truck Is Being Loaded With Pipes In A Construction Site — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: BGC Construction
A Yellow Komatsu Excavator Is Working On A Pipe — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Clarke Energy
A Truck Is Being Lifted By A Crane On A Dirt Road — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Synergy Resource Management
A Large Semi Truck Is Carrying A Large Load Of Pipes — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Synergy Resource Management
A Man Is Digging In The Dirt Near A Body Of Water — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Newcrest Mining Ltd
A Truck Is Carrying A Yellow Excavator On A Dirt Road — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Monadelphous
A Row Of Construction Vehicles Are Parked On The Side Of A Dirt Road — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Evolution Mining Ltd
A Construction Site With A Lot Of Pipes And A Yellow Excavator — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Newcrest Mining Ltd
A Yellow Komatsu Excavator Is Working On A Dirt Road — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Aurelia Metals Ltd
A Construction Site With A Lot Of Machinery And Pipes — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Evolution Mining Ltd
More Posts