Lead and Zinc, Processing Plant Expansion

Client: Aurelia Metals Ltd

Project : Lead and Zinc, Processing Plant Expansion

Site : Peak Gold

Date : August 2019 – February 2020

Blackpoly was awarded the supply and fabrication of all HDPE pipe spooling, this ranged from DN63 through to DN400. Blackpoly also completed the fabrication and delivery of floatation cell launder chutes and custom HDPE hoppers and tanks

A Truck Is Being Loaded With Pipes In A Construction Site — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: BGC Construction
A Yellow Komatsu Excavator Is Working On A Pipe — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Clarke Energy
A Truck Is Being Lifted By A Crane On A Dirt Road — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Synergy Resource Management
A Large Semi Truck Is Carrying A Large Load Of Pipes — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Synergy Resource Management
A Man Is Digging In The Dirt Near A Body Of Water — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Newcrest Mining Ltd
A Truck Is Carrying A Yellow Excavator On A Dirt Road — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Monadelphous
A Row Of Construction Vehicles Are Parked On The Side Of A Dirt Road — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Evolution Mining Ltd
A Construction Site With A Lot Of Pipes And A Yellow Excavator — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Newcrest Mining Ltd
A Construction Site With Pipes And A Bridge In The Background — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Abergeldie Complex Infrastructure, Veolia Water
A Construction Site With A Lot Of Machinery And Pipes — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Evolution Mining Ltd
More Posts