Stage H Open Pit, Pipeline Realignment

Client: Evolution Mining Ltd

Project : Stage H Open Pit, Pipeline Realignment

Site : Lake Cowal Operations

Date : April 2017 – May 2017

Blackpoly completed the supply and installation of an open pit dewatering pipeline, this consisted of the supply and installation of an 1100mtr 400mm PN10 pipeline, and the removal of all existing DN250 ring main and DN90 bore pipelines and pumps.

A Truck Is Being Loaded With Pipes In A Construction Site — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: BGC Construction
A Yellow Komatsu Excavator Is Working On A Pipe — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Clarke Energy
A Truck Is Being Lifted By A Crane On A Dirt Road — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Synergy Resource Management
A Large Semi Truck Is Carrying A Large Load Of Pipes — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Synergy Resource Management
A Man Is Digging In The Dirt Near A Body Of Water — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Newcrest Mining Ltd
A Truck Is Carrying A Yellow Excavator On A Dirt Road — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Monadelphous
A Construction Site With A Lot Of Pipes And A Yellow Excavator — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Newcrest Mining Ltd
A Construction Site With Pipes And A Bridge In The Background — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Abergeldie Complex Infrastructure, Veolia Water
A Yellow Komatsu Excavator Is Working On A Dirt Road — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Aurelia Metals Ltd
A Construction Site With A Lot Of Machinery And Pipes — Blackpoly Pipelines in Orange, NSW
July 22, 2024
Client: Evolution Mining Ltd
More Posts