Client : 

Synergy Resource Management

Project :

Worona Pipeline Bridge Pilon Encasement

Site :

Worona, Sydney Water

Date :

April 2017 – May 2017

Blackpoly provided the design and installation of a HDPE lining system to encase existing pylons along an essential pipeline bridge. The liners were installed onsite within an active tidal water system.